Construction of Mixed-in-Place cut-off wall for a gravel mining depot along the river Maas. The cut-off wall was partly as a dike stabilisation wall.
Main contractor: Van den Biggelaar B.V.
Client: Consortium Grensmaas
Scope: 14,000 m² Mixed-In-Place cut-off wall thickness 55 cm and depth approx. 10 m with a length of approx 1,500 m.
Execution period: Jun. - Aug. 2008