On behalf of our international team at East St. Louis in USA
We are pleased to inform that the team has successfully completed both the cut-off wall works by means of Diaphragm Wall and jet grouting works. ...
more
On behalf of our team at Eagle Mountain Dam in the USA
We are pleased to announce that the team has successfully completed both the cut-off wall work using Cutter-Soil Mixing (CSM) and the drilling and grouting work. All work was carried out in the vicinity of the existing spillway.
more
On behalf of our team at Teesta VI in India
We inform you that our crew has successfully completed both the jet grouting works and phase 1 of the diaphragm wall works. The diaphragm wall works included pre-treatment by grouting, trench excavation and concreting.
more
The team of BAUER Engineering India Pvt. Ltd. completed works at Arun-III HEP in Nepal
The team of BAUER Engineering India Pvt. Ltd. completed at Arun-III HEP in Nepal, the execution of a grout curtain consisting of three rows at the upstream cofferdam.
more
The team of BAUER Engineering Ghana Ltd., has successfully completed the second project at Obuasi Mine.
Scope of works consist of 34 nos secant piles for one circular ventilation shaft. 4 nos load bearing piles to provide solid anchor points for the raise borer beams, and 1 nos drilled at the centre of the KMVS shaft position to enable piloting through concrete pile instead of weathered ground.
more