Rehabilitation of an existing dike along the river Danube with Mixed-in-Place Cut off wall to improve the water impermeability and to assure the stability of dike system.
Straubing is a city in the administrative district of Lower Bavaria in Eastern Bavaria. In the late Middle ages the city was one of the capitals of the Bavarian duchies along with Munich, Landshut and Ingolstadt, which is reflected in the architecture to this day.
Employer: Wasser- und Schifffahrtsamt Nürnberg
Client: Wasser- und Schifffahrtsamt Nürnberg
Scope of Works: 34000 m² Mixed-in-Place Cut-off Wall; thickness 55 cm; depth up to 16 m
Equipment: RG 25 Mixed-in-Place
Geology: gravel, sand, silt, clay
Construction period: 2013 - 2014